{"id":139892,"date":"2021-02-05T00:01:25","date_gmt":"2021-02-05T05:01:25","guid":{"rendered":"https:\/\/thevwindependent.com\/news\/?p=139892"},"modified":"2021-02-05T00:16:54","modified_gmt":"2021-02-05T05:16:54","slug":"group-questions-wind-project","status":"publish","type":"post","link":"https:\/\/thevwindependent.com\/news\/2021\/02\/05\/group-questions-wind-project\/","title":{"rendered":"Group questions area wind project"},"content":{"rendered":"\n<p><strong>To the Editor:<\/strong><strong><\/strong><\/p>\n\n\n\n<p>We represent a group of concerned citizens of the Grover Hill community in Paulding County.&nbsp;Starwood Energy Group is in the process of trying to construct a wind turbine project (called Grover Hill Wind) of approximately 37 turbines in two townships in and around the community.&nbsp;The project is currently in the &#8220;Pre-application&#8221; phase (Case Number: 20-0417-EL-BGN), according to the Ohio Power Siting Board, which regulates the construction of wind projects.&nbsp;<\/p>\n\n\n\n<p>This company has actually started constructing access roads and installing turbine bases at this time.&nbsp;How can construction begin on a project that has not been issued the proper certificate from the Ohio Power Siting Board?&nbsp; Something about this entire situation is not correct.&nbsp;To see picture evidence of these construction activities click on this link:<\/p>\n\n\n\n<p><a href=\"http:\/\/dis.puc.state.oh.us\/DocumentRecord.aspx?DocID=aec4e4b9-a6ea-45c5-a3a4-ce3427bf1b29.\">http:\/\/dis.puc.state.oh.us\/DocumentRecord.aspx?DocID=aec4e4b9-a6ea-45c5-a3a4-ce3427bf1b29.<\/a><\/p>\n\n\n\n<p>The Ohio Power Siting Board has been notified and will be contacting the company and scheduling a site visit.&nbsp;Has this company blatantly overstepped its authority and begun construction on a project that has not been approved by our state regulatory agencies?&nbsp;It appears to be that way.&nbsp;What does that say about the reputation of their company?<\/p>\n\n\n\n<p>Ironically, this week a bill will be introduced in the Ohio Senate that will give township residents the right to referendum to vote in favor or opposed to a wind project. This bill will be fiercely rejected by the wind industry.&nbsp;But our specific situation proves exactly why this bill is essential to rural Ohio residents.&nbsp;<\/p>\n\n\n\n<p>Wind companies have repeatedly trampled the rights and the will of the people when developing these projects.&nbsp;It is their claim that the Ohio Power Siting Board has an extensive process to allow citizens input in the development of these projects.&nbsp;Clearly that process is not remotely sufficient in our community&#8217;s case.&nbsp;<\/p>\n\n\n\n<p>If wind companies start construction whenever they want without the Ohio Power Siting Board\u2019s full approval it&#8217;s time for this bill to become law.&nbsp;This gives citizens a direct voice in something that will impact our communities for decades to come. It&#8217;s time for Ohio residents that will be impacted by the development of these types of community altering projects to have a direct say on whether they are wanted or not.&nbsp;&nbsp;<\/p>\n\n\n\n<p>With respect,<\/p>\n\n\n\n<p><strong>Jeremy Kitson<\/strong><br><strong>Citizens for Clear Skies<\/strong><br><strong>Citizens Against the Grover Hill Wind Project&nbsp;<\/strong><br><em>via email<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>To the Editor: We represent a group of concerned citizens of the Grover Hill community in Paulding County.&nbsp;Starwood Energy Group is in the process of trying to construct a wind turbine project (called Grover Hill Wind) of approximately 37 turbines in two townships in and around the community.&nbsp;The project is currently in the &#8220;Pre-application&#8221; phase [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[84],"tags":[],"class_list":["post-139892","post","type-post","status-publish","format-standard","hentry","category-letters"],"publishpress_future_action":{"enabled":false,"date":"2026-04-19 02:46:46","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/thevwindependent.com\/news\/wp-json\/wp\/v2\/posts\/139892","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thevwindependent.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thevwindependent.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thevwindependent.com\/news\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/thevwindependent.com\/news\/wp-json\/wp\/v2\/comments?post=139892"}],"version-history":[{"count":0,"href":"https:\/\/thevwindependent.com\/news\/wp-json\/wp\/v2\/posts\/139892\/revisions"}],"wp:attachment":[{"href":"https:\/\/thevwindependent.com\/news\/wp-json\/wp\/v2\/media?parent=139892"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thevwindependent.com\/news\/wp-json\/wp\/v2\/categories?post=139892"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thevwindependent.com\/news\/wp-json\/wp\/v2\/tags?post=139892"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}